HND Banner

  NEWSROOM   WHO WE ARE   MISSIONS   HISTORY RELATED LINKS  
HOW DO I...

» Contact CEHNC?
» Contract with CEHNC?
» Get a Job with CEHNC?
» Get Visitors' Information?

» Request FOIA Info?
» Find TECHINFO?
» Find USA.Gov Info

» Find a Local Corps Office?
» Find Corps Publications?
» Find a Corps Map?

» Advanced USACE Search
» Site Map
» Remote Network Access
 USACE, HNC Home, EM CX Home  

Available Services

Remediation System Evaluations (RSE)

Optimization for Protectiveness and Cost Effectiveness

Remediation System Evaluations (RSEs) are holistic evaluations of remedies meant to achieve a number of goals, including:

  • Assuring there is a clear system objective (an end to the project),
  • Evaluating the protectiveness of the system
  • Reducing costs and optimizing the system performance considering current conditions and new technologies, and
  • Assuring adequate maintenance of government-owned equipment by operators.

The RSEs are typically done by highly experienced professionals, including environmental or chemical engineers and hydrogeologists independent from the project.  The reviews provide specific recommendations for increasing remedy effectiveness, for decreasing annual or life-cycle costs, for technical improvement and operability, and for achieving site closeout.   The recommendations may represent minor adjustments in the current maintenance or operations or may suggest entirely new technologies.   The process has been applied at over 40 Federal sites, including sites under the control of the Environmental Protection Agency (EPA), Department of Defense, Department of Energy, and National Aeronautics and Space Administration.  The EPA has adopted the RSE process for optimization of Superfund remedies financed by EPA and/or the States.

RSE Optimization Tools
Click link above to obtain tools for conducting RSEs for operating remedies.  These include checklists, sample scopes of work for conducting RSEs, template contract language for operators to collect and report data necessary for assessing and optimizing performance. 

Environmental Community of Practice (eCoP) – Long-Term Remediation Management and Optimization Area of Interest
Click link above to access other tools and information related to remedy and monitoring optimization.  These tools include guidance, software, and case studies from USACE and other agencies.

Optimization Services
As the developer of the RSE process, the EM CX can provide the independent expert evaluation of existing remedies.  Staff members have conducted RSEs at numerous sites (see below), and are very knowledgeable on optimization techniques.  The EM CX can perform RSEs for much less than the typical annual cost savings identified during RSEs.  EM CX staff include environmental and chemical engineers, hydrogeologists, risk assessors, regulatory specialists, cost engineers, and chemists versed in optimization.   The RSEs are typically led by an environmental/chemical engineer and a hydrogeologist.  Contact  (402-697-2655) or (402-697-2580) for more information on how the CX can assist in optimization.

CX Optimization Experience
The EM CX has participated in over 30 RSEs for the Army, Air Force, EPA, the Department of Energy, and NASA since 1998.  Significant improvements to the evaluated remedies have resulted as a result.  A representative list of sites for which RSEs have been conducted is provided below.  An example report can be accessed here.

Army – Fort Lewis, WA; Tooele Army Depot, UT

FUDS – Former West Virginia Ordnance Works, Former Nebraska Ordnance Plant

Air Force – Ellsworth AFB, SD;  Moody AFB, GA

EPA Superfund Sites – Over 20 sites including these most recent studies: Peerless Plating, MI; South Jersey Clothing, NJ; Higgins Farm, NJ; Mohonk Road, NY

Department of Energy – Hanford Facility (5 Pump and Treat Systems)

NASA – Wallops Island Facility 

Back


POC: Webmaster
Related Links:   EM CX Home Page 
Page last modified:  05/11/2010